Public Hearings for New Groundwater Management Plan

Three public hearings are scheduled across the Papio-Missouri River Natural Resources District (P-MRNRD) to gather community feedback on the District’s new Groundwater Management Plan.

The current P-MRNRD Groundwater Management Plan for the six-county NRD area including Sarpy, Douglas, Washington, and Dakota Counties plus the eastern portions of Burt and Thurston Counties in Nebraska, acknowledged a lack of existing information about groundwater quantity and quality. Since 1994, P-MRNRD has gathered a significant amount of hydrogeologic information on the distribution of groundwater aquifers across the district. Furthermore, with over 30 years of groundwater monitoring data, information on specific areas within the district with water quantity and quality issues have been identified.

Topics to be discussed at the public hearings include:

– Who would be affected?
– Proposed rules and regulations
– What are the benefits of the new plan?
– What would change?
– What portions of the District may be designated as a Groundwater Management Area?

More than 750,000 people live in the Papio-Missouri River NRD area and many rely on clean groundwater as their drinking water supply, for irrigation, and various industrial uses. The new Groundwater Management Plan has been prepared with more recent data, as well as input from stakeholders across the District who represented groundwater users in the NRD. The new Groundwater Management Plan is expected to replace the existing plan.

Public Hearings

The public hearings in Dakota City, Tekamah, and Omaha are scheduled as follows:

  • November 30, 2017 @ 6:30 p.m. – Dakota City Field Office, 1505 Broadway, Dakota City, NE
  • December 7, 2017 @ 6:30 p.m. – First Northeast Bank of Nebraska, 2nd Floor Conference Room, 448 South 13th Street, Tekamah, NE
  • December 14, 2017 @ 7:00 p.m. – Natural Resources Center, 8901 S. 154th Street, Omaha, NE

Cost-Sharing Conservation Plans Available to Farmers and Ranchers

Farmers and ranchers interested in soil, water and wildlife conservation are encouraged to sign up now for the Environmental Quality Incentives Program (EQIP).  EQIP is available from the USDA Natural Resources Conservation Service (NRCS).  Those interested in applying for fiscal year 2018 program funds are encouraged to sign up before October 20, 2017.

EQIP is a voluntary conservation program available to private landowners and operators.  Through EQIP farmers and ranchers may receive financial and technical help to install conservation practices on agricultural land, such as examples pictured below.

Grassed waterway on the Bureau of Indian Affairs (BIA) tract south of Macy on the Omaha Indian Reservation.

According to Craig Derickson, NRCS State Conservationist, there are several options available to producers through EQIP.  “EQIP is one of our most versatile programs.  It offers cost-share and technical assistance to apply conservation measures on cropland and rangeland, as well as for animal feeding operations and establishing or enhancing wildlife habitat.  There are many opportunities available, and NRCS staff can help landowners and operators sort out their EQIP options.”

Individuals interested in entering into an EQIP agreement may apply at any time, but the ranking of applications on hand to receive funding will begin October 20, 2017.  The first step is to visit your local NRCS office in Dakota City or Walthill and complete an application.

 

Installation of a water pipeline on the Gerald Bousquet farm north of Hubbard, Nebraska, using an underground boring machine instead of a trencher to prevent possible erosion along the steep hillside.

 

For more than 75 years, the Natural Resources Conservation Service (NRCS) has helped agricultural producers design and install conservation plans.  NRCS Conservationists work with landowners on their farm or ranch to develop a conservation plan based on resource goals.  Conservation planning assistance is free and does not require participation in financial programs.

For more information about the Environmental Quality Incentives Program (EQIP) and other conservation programs, visit your local NRCS field office or go online at www.ne.nrcs.usda.gov.

 

Papio-Missouri River NRD Board Approves Property Tax Decrease and 2018 Budget

 

 

 

 

FOR IMMEDIATE RELEASE: 9/15/17

Contact: Jennifer Stauss
Office Phone 402-315-1708
Cell Phone 402-960-5329 

 

 

Papio-Missouri River NRD Board Approves Proposed 2018 Budget
Decrease in Property Tax Levy

Omaha, NE: At its September 14th meeting in Dakota City, the Papio-Missouri River Natural Resources District Board of Directors voted to approve the Fiscal Year 2018 general operating budget that includes a decrease in the NRD property tax levy.

“The District’s property tax levy will decrease this year and the District trimmed nearly $4 million off its overall budget from 2017,” said NRD General Manager, John Winkler. “For 12 out of 13 years, the District has either decreased or kept the tax levy the same. We work very hard to save local taxpayers millions of dollars. It’s our responsibility,” said Winkler.

The FY 2018 budget calls for a property tax levy of .037797 per $100 of assessed valuation, which means a homeowner with property valued at $100,000 would pay a total of $37.80 in property taxes next year to support NRD projects. The budget calls for an estimated $23 million in revenue from the NRD’s property tax levy. Total spending is estimated at $66.7 million.

The Papio-Missouri River NRD’s property tax levy amounts to less than two percent of the total property tax bill for residents living within the District’s six-county area. The levy is based on an estimated 4.6 percent increase in valuations across the district, which includes all of Sarpy, Douglas, Washington and Dakota counties, plus the eastern 60% of Burt and Thurston counties.

 

###

No Tax Levy Increase in Papio NRD’s Approved Proposed Budget

 FOR IMMEDIATE RELEASE: 8/11/17

Contact: John Winkler, General Manager
Office Phone 444-6222
Cell Phone 402-616-2457 

 

Papio-Missouri River NRD Board Approves Proposed 2018 Budget
No Increase in Tax Levy

Omaha, NE: At its August 10th meeting, the Papio-Missouri River Natural Resources District Board of Directors heard public comments and then voted to propose a Fiscal Year 2018 general operating budget that will, once again, require no increase in the NRD property tax levy.

“The District’s property tax levy will remain the same as last year,” said NRD General Manager, John Winkler. “This is 12 out of 13 years the District has either decreased or kept the tax levy the same. We work extremely hard to leverage federal and state cost sharing on projects to save local taxpayers millions of dollars,” said Winkler.

In addition, Winkler said the FY 2018 proposed budget is $1.5 million less than last year and the District is able to maintain a responsible budget and healthy financial position despite increases in costs like permitting, insurance, wages, materials and land costs.

The proposed budget calls for a FY 2018 property tax levy of .038034 per $100 of assessed valuation. This means that a homeowner with property valued at $100,000 would pay a total of $38.03 in property taxes next year to support NRD projects.The budget calls for an estimated $23 million in revenue from the NRD’s property tax levy. Total spending is estimated at just under $69 million.

The Papio-Missouri River NRD’s property tax levy amounts to less than two percent of the total property tax bill for residents living within the District’s six-county area.The levy is based on an estimated 3.5 percent increase in valuations across the district, which includes all of Sarpy, Douglas, Washington and Dakota counties, plus the eastern 60% of Burt and Thurston counties.

The NRD Board of Directors will hold a public hearing, approve a final budget and set the tax levy at its September 14th board meeting in Dakota City.

 

###

 

 

Free Scrap Tire Collection on August 24

Free scrap tire collection! The Lower Elkhorn NRD, Papio-Missouri River NRD, and Nebraska Loess Hills RC&D Council will have a free scrap tire collection on Friday, August 24, 2018, from 8:00 a.m. to 12:00 p.m. (noon) at the Cuming County Fairgrounds in West Point, NE.

This collection will accept all sizes of car, truck, semi and tractor tires. Each load is limited to 100 tires. No rims will be accepted so ALL tires must be off rim.  Tires cannot be accepted from any business which charges a tire disposal fee.  Do not leave vehicles unattended in line. Limited unloading help will be available, so plan to unload your own. The collection ends at noon, and the gates will be locked at that time, so be sure to arrive before 12:00 p.m. (noon).

The 10 county collection area includes Burt, Colfax, Cuming, Dakota, Dodge, Douglas, Sarpy, Stanton, Thurston, and Washington counties.  Residents and businesses which do not charge tire disposal fees can dispose of tires at this collection.  Vehicles must use Mill Street to access the fairgrounds. From Hwy 275 turn west on 13th Street then head south on Mill Street. Loads with less than 20 tires are encouraged to arrive during the last 90 minutes of the collection for a shorter wait time.

Champlin Tire Recycling will process tires collected during the event.  This processing includes repair and retread of salvageable casings, reclamation of tires meeting used tire specifications and the production of park benches, picnic tables, and feed bunks. Funding for this free collection is provided through a grant from the Nebraska Department of Environmental Quality.

For more information please contact Deborah Ward at the Papio-Missouri River NRD (402)374-1920 ex. 3.

NRD Earns Second Highest Bond Rating

The Papio-Missouri River NRD has been notified that the district received an excellent bond rating that will save tax dollars as the district refinances Flood Protection and Water Quality Enhancement bonds. S&P Global Ratings has assigned the NRD a AA- bond rating, the second highest possible. “This is great news for our local taxpayers,” said John Winkler, NRD General Manager. “The rating reflects the NRD’s credit worthiness exemplified by its strong financial position, diverse and growing tax base and positive fiscal management,” he said.

The bonded funding is being used to construct flood control projects and water quality improvements in the district.

At their April, 2017 board meeting, the NRD Board of Directors took action to refinance Flood Protection and Water Quality Enhancement Bonds that may ultimately save NRD-area property taxpayers millions of dollars.

The NRD issued $58,200,000 of Flood Protection and Water Quality Enhancement Bonds over two bond offerings in 2013. Interest rates have declined to a point where refinancing a portion of the outstanding bonds may achieve interest cost savings over the remaining life of the bonds.

“The Nebraska Legislature entrusted the NRD with the opportunity to fund projects using bonding authority and we always seek ways to be good stewards of this authority,” said John Winkler, NRD General Manager. “We believe we can save taxpayers one to two million dollars through this refinancing effort.”

The Board of Directors approved parameters for the refinancing of the bonds and directed the General Manager to explore the best course of action.

In 2015, the district refinanced bonds issued in 2010 and achieved approximately $460,000 of interest cost savings.

The district includes all of Sarpy, Douglas, Washington and Dakota Counties plus the eastern portion of Burt and Thurston Counties.

 

NRD Bond Refinancing to Potentially Save $Millions

At their April, 2017 board meeting, the NRD Board of Directors took action to refinance Flood Protection and Water Quality Enhancement Bonds that may ultimately save NRD-area property taxpayers millions of dollars.

The NRD issued $58,200,000 of Flood Protection and Water Quality Enhancement Bonds over two bond offerings in 2013. Interest rates have declined to a point where refinancing a portion of the outstanding bonds may achieve interest cost savings over the remaining life of the bonds. The bonded funding is being used to construct flood control projects and water quality improvements in the district.

“The Nebraska Legislature entrusted the NRD with the opportunity to fund projects using bonding authority and we always seek ways to be good stewards of this authority,” said John Winkler, NRD General Manager. “We believe we can save taxpayers one to two million dollars through this refinancing effort.”

The Board of Directors approved parameters for the refinancing of the bonds and directed the General Manager to explore the best course of action.

In 2015, the district refinanced bonds issued in 2010 and achieved approximately $460,000 of interest cost savings.

The district includes all of Sarpy, Douglas, Washington and Dakota Counties plus the eastern portion of Burt and Thurston Counties.

 

Draft Preliminary Groundwater Plan Approved

At their March 9 Board of Directors meeting the board approved a preliminary draft Groundwater Management Plan for the six-county NRD area including Sarpy, Douglas, Washington, and Dakota Counties plus the eastern portions of Burt and Thurston Counties in Nebraska.

The plan was last updated by the Papio-Missouri River NRD in 1994. Since 1994, a significant amount of hydrogeologic information has been gathered on the distribution of groundwater aquifers across the district. Furthermore, with over 30 years of groundwater monitoring data, information on specific areas within the district with water quantity and quality issues have been identified.      “Over 750,000 people live in the Papio-Missouri River NRD area and many rely on clean groundwater as their drinking water supply, and for irrigation as well as businesses across the district rely on groundwater for various industrial uses,” said John Winkler, NRD General Manager.

The NRD hosted a series of stakeholder committee meetings across the six-county area. These volunteer stakeholder committees represented groundwater users in the NRD and the meetings were also attended by County, State, and Federal agencies who provided technical assistance and advice. The role of Stakeholder groups was to convey local groundwater concerns, help define groundwater life goals and management objectives, help identify appropriate resources management actions, and serve as educators/advocates for groundwater in their communities.

Since the completion of stakeholder committee meetings last November, a preliminary draft update to the NRD’s GMP has been completed. This document is intended to entirely replace the existing 1994 plan. This draft plan will now be submitted to the Nebraska Department of Natural Resources (NDNR) for their statutory 90-day review period. NDNR will also solicit other state agency comments. Following NDNR’s review and comment, a draft GMP will be the subject of a public hearing to be held prior to final approval of the plan by the Papio-Missouri River NRD Board of Directors.

Winkler noted that “we are blessed with an abundant supply of good groundwater in most areas of the district and the goal of the plan is to sustain the quantity and quality of the groundwater we have.”

See the Draft Plan here

Board Approves Contract for Southern Sarpy County Watershed Study

A contract for an engineering study to develop policies related to storm water management in the southern Sarpy County area has been approved by the Papio-Missouri River Natural Resources District Board of Directors.

“Now is the time to act to insure that both water quality and potential flooding issues are being addressed before extensive development occurs,” said NRD General Manager, John Winkler.  “We can avoid many of the difficulties we encountered in the Papillion Creek Watershed – trying to manage storm water runoff in an area already significantly urbanized,” he said.

In October, 2016 the board approved an interlocal agreement with Bellevue, Gretna, Papillion, Springfield and Sarpy County to form the Southern Sarpy Watershed Partnership to address water issues before the area is developed. The watershed includes all areas of Sarpy County draining directly toward the Elkhorn or Platte Rivers.

The work will take place in three phases over a five year period. The Board approved a phase one contract with FYRA Engineering for $400,640. The cost of the study will be shared among the members of the Southern Sarpy Watershed Partnership.

Unlike the Papillion Creek Watershed, the Southern Sarpy County Watershed has very little stream or water quality data available. The need to develop a comprehensive watershed management plan is the top priority of the new partnership.

Two Omaha metro area reservoir projects receive funding through NE Water Sustainability Fund

The Papio-Missouri River Natural Resources District will receive $6.7 million from the NE Water Sustainability Fund managed by the NE Natural Resources Commission. The commission approved the funding at their December meeting for Papillion Creek Watershed flood prevention reservoir sites West Papio 6 and West Papio 7 in Sarpy County.

 

“We are extremely grateful to the commission for this funding. They had many worthy projects to consider and their support for the Omaha area’s flood prevention needs is appreciated,” said John Winkler, NRD General Manager. “These two projects have a rate of return to the taxpayers of 2.31 to 1; so for every dollar spent the taxpayer will receive two dollars and thirty one cents in return on that investment,” he said.

 

The NE Water Sustainability Fund was created by the NE Legislature to boost state financial involvement in a variety of projects to facilitate Nebraska’s critical water management needs.

“First and foremost, the District will now be able to accelerate the construction of these two reservoirs (WP 6 & WP 7) and we will be able to dedicate additional resources to the preliminary design of five additional priority flood prevention reservoirs which are currently under extreme pressure from development interests,” said Winkler. “Our current floodway mapping study is showing that every reservoir constructed has a net positive improvement in the floodplain going from now into the future,” he said.

 

The district will use the $6.7 million to complete land rights acquisition and construction for the two reservoir sites. “This Water Sustainability Fund financial assistance will further reduce pressure on property taxes,” said Winkler.

 

Dam Site WP-6 will be built on the west side of 114th Street, north of Cornhusker Rd. The site will be managed for recreation by the City of Papillion. The lake created by WP-6 will be approximately 34 acres of water surrounded by an additional 69 acres of public parkland.

 

WP-7 will be built on the east side of 108th Street, south of Cornhusker Road. This project will also be managed for recreation by the City of Papillion. The lake created by WP-7 will be approximately 13 acres of water surrounded by an additional 32 acres of public parkland.      Both reservoirs will enhance flood protection for property and public infrastructure downstream along the West Papio Creek, adding flood protection to residents of the Cities of Papillion and Bellevue.       The projects are in cooperation with the Papillion Creek Watershed Partnership consisting of the NRD, Sarpy County and the Cities of Omaha, Papillion, Bellevue, LaVista, Gretna, Ralston, and Boys Town. The Partnership seeks workable solutions to address flood prevention along with stream and lake water quality that will enhance the quality of life for metro area’s residents.

See this web page for more information

 

Top